郭旭東,齊敏,宋玉霞 ★北京廣利核系統(tǒng)工程有限公司
摘要:當(dāng)前國(guó)內(nèi)核電機(jī)組的DCS驗(yàn)證采用工廠(chǎng)測(cè)試和現(xiàn)場(chǎng)調(diào)試獨(dú)立策劃 的方式,國(guó)外三代核電(如EPR、AP1000等)的DCS系統(tǒng)采用工廠(chǎng)測(cè)試 與現(xiàn)場(chǎng)調(diào)試總體策劃的測(cè)試模式。本文借鑒EPR、AP1000的整體策劃實(shí) 踐,通過(guò)對(duì)核電DCS系統(tǒng)工廠(chǎng)測(cè)試與現(xiàn)場(chǎng)調(diào)試邏輯功能驗(yàn)證方案進(jìn)行對(duì) 比分析和研究,找出差異,為核電DCS系統(tǒng)工廠(chǎng)測(cè)試與現(xiàn)場(chǎng)調(diào)試全范圍 功能測(cè)試實(shí)施打下基礎(chǔ),有利于核電DCS系統(tǒng)工廠(chǎng)測(cè)試、現(xiàn)場(chǎng)調(diào)試的優(yōu) 化和質(zhì)量提升,從而控制工期和成本。
關(guān)鍵詞:核電;DCS;邏輯;測(cè)試
Abstract: At present, the DCS verification of domestic nuclear power units is planned independently by DCS factory test and nuclear power factory debugging. The DCS system of three generations of foreign nuclear power plants (such as EPR, AP1000, etc.) adopts the test mode of overall plan of factory test and nuclear power factory debugging. Based on the overall planning practice of EPR, AP1000, this paper compares and analyzes the verification scheme of logic function between plant test and field debugging of nuclear DCS system, finds out the difference and lays a foundation for the implementation of fullrange functional test of nuclear power DCS system factory test and field debugging, which is conducive to the optimization and quality improvement of nuclear power DCS system factory test and field debugging, so as to the control of construction period and cost.
Key words: Nuclear power plant; DCS; Logic; Test
點(diǎn)擊預(yù)覽:核電DCS系統(tǒng)工廠(chǎng)測(cè)試與現(xiàn)場(chǎng)調(diào)試邏輯功能驗(yàn)證方案對(duì)比分析和研究.pdf
摘自《自動(dòng)化博覽》2021年5月刊